(1)A Hybrid Two-stage Flowshop Scheduling Problem. Asia-Pacific Journal of Operational Research (APJOR), ISSN 0217-5959, Feb. 2007, Vol. 24, No.1, 45-56.
(2)A Hybrid two-Stage flexible flowshop scheduling problem with midentical parallel machines and a burn-in processor separately. Journal of Shanghai University(上海大学学报(英文版) ), ISSN 1007-6417, Feb. 2007, 11(1): 33-38.
(3)带成组加工的二阶段柔性流水作业问题. 工程数学学报, ISSN 1005-3085, 2008年10月, 25(5): 829-842.
(4) A two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batchprocessor on the other stage. Journal of Harbin Institute of Technology(哈尔滨工业大学学报(英文版)). ISSN1005-9113, Oct. 2008, 15(5): 674-678.